Wastewater/Activity/PacpInspection/1.0Jul 19, 2022, 05:19 AM
  • 02 1549_02 1548_07182022_223913.mp4

Date
07/18/2022
W/O
961780
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00230
PipeID
P03981
Time
10:19 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9985
Sewer Name
02 ARIZONA AVENUE TRUNK, SECTION 1
City
LOS ANGELES
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_961780_TV02006_JUL2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
15 in.
Upstream MH
02 1549
Downstream MH
02 1548
Dir. of Survey
Downstream
Length Surveyed
311.1 ft.
Total Length
311.2 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 02 1549 to 02 1548
MH: 02 1549MH: 02 1548downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 15490 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK10.4 ft. CM - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES12.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start40.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"52.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"77 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6"79.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"102.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"123.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"125.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"151.7 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"177.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"179.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"203.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"226.4 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"229.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"257.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"280.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"283.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"311.2 ft. AMH - Downstream Manhole, Survey Ends - 02 1548 GIS CALLS FOR 311'311.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish311.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

    10.4 ft. - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    12.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
0MWM
12.6CM
311.2AMH02 1548 GIS CALLS FOR 311'
203.2TF
40.4TFC
229.1TFC
123.1TFC
125.6TFC
79.4TFC
0AMH02 1549
0MWL
77TF
177.8TFC
151.7TFA
280.3TFC
226.4TFA
179.8TFC
10.4CM
52.9TF
0MGOCONNECTION AT MH 9 O'CLOCK
283.1TF
257.1TF
311.2CM
102.4TF
311.2MGOCONNECTION AT MH 9 O'CLOCK

Properties (7)

additional_info
630074071822201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-07-18T22:19:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false