Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 19, 2022, 05:40 AM
  • 02 1548_02 1547_07182022_225710.mp4

Date
07/18/2022
W/O
961780
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00230
PipeID
P03980
Time
10:40 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9985
Sewer Name
02 ARIZONA AVENUE TRUNK, SECTION 1
City
LOS ANGELES
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_961780_TV02006_JUL2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
15 in.
Upstream MH
02 1548
Downstream MH
02 1547
Dir. of Survey
Downstream
Length Surveyed
299.3 ft.
Total Length
299.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 02 1548 to 02 1547
MH: 02 1548MH: 02 1547downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 15480 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area8.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start38.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"48.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"71.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6"74.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"103.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"121.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"123.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"149 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"172.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"174.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"199.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"220.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6"222.8 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"248.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"266.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"268.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"299.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish299.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1547 GIS CALLS FOR 299'299.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
299.3AMH02 1547 GIS CALLS FOR 299'
103.2TF
0AMH02 1548
172.2TFC
299.3MGOCONNECTION AT MH 9 O'CLOCK
220.1TF
121.2TFC
222.8TFA
38.3TFC
199.8TFC
48.9TF
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
123.5TF
149TF
299.2CM
268.9TFC
8.2CM
71.7TF
174.6TF
74.4TF
248.5TF
266.4TFC
0MWL

Properties (7)

additional_info
630074071822201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-07-18T22:40:10-07:00
documentation
PRO PIPE
is_lateral_inspection
false