Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2022, 05:58 AM
  • 02 1561_02 1560_07272022_231435.mp4

Date
07/27/2022
W/O
961783
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00230
PipeID
P03993
Time
10:58 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9995
Sewer Name
02 ARIZONA AVENUE TRUNK, SECTION 1
City
E LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_961783_TV02004_JUL2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
12 in.
Upstream MH
02 1561
Downstream MH
02 1560
Dir. of Survey
Downstream
Length Surveyed
321.5 ft.
Total Length
321.5 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
189
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
189
Pipe schematic from manhole 02 1561 to 02 1560
MH: 02 1561MH: 02 1560downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 15610 ft. MWM - Water Mark, 25 %of cross sectional area4.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start59 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"59.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"100.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"141.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"147.6 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 4"180 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"221.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"224 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6"267.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"272.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"313.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"321.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish321.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1560 gis calls for 320'

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    59.5 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 4"

    147.6 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 4"

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6"

    224 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6"

Observations (18)

DistanceCodeObservation
100.3TF
321.5CM
0MGOCONNECTION AT MH 3 O'CLOCK
59TFC
224TB
313.7TF
147.6TB
321.5AMH02 1560 gis calls for 320'
272.5TF
0MWL
4.3CM
267.1TF
59.5TB
0AMH02 1561
221.3TFC
141.7TFC
0MWM
180TF

Properties (7)

additional_info
630098072722202
custom_field_three
cracks
custom_field_two
3
customer
1
datetime
2022-07-27T22:58:50-07:00
documentation
PRO PIPE
is_lateral_inspection
false