Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 27, 2022, 04:58 AM
  • H 0341_H 0353A_07262022_220220.mp4

Date
07/26/2022
W/O
961907
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00175
PipeID
P22110
Time
9:58 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9992
Sewer Name
H JOINT OUTFALL H - UNIT 4
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19A
Purpose
Routine Assessment
Project
RFIR_WO_961907_TV02325_JUL2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Width
63 in.
Upstream MH
H 0353A
Downstream MH
H 0341
Dir. of Survey
Upstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
4
Structural Quick
5131
Structural Rating
8
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
12
Pipe schematic from manhole H 0353A to H 0341
MH: H 0353AMH: H 0341upstream0 ft. MGO - General Observation - MAG COATING0 ft. AMH - Upstream Manhole, Survey Ends - H 03410 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES0 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. AMH - Downstream Manhole, Survey Begins - H 0353A2 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. MWL - Water Level, 20 %of cross sectional area

Observation photos (3)

  • General Observation - MAG COATING

    2 ft. - General Observation - MAG COATING

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (7)

DistanceCodeObservation
2MGOMAG COATING
0AMHH 0353A
2AMHH 0341
0MWM
2SAP
2SRV
0MWL

Properties (7)

additional_info
630074072622202
custom_field_three
AGGREGATE PROJECTING, REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2022-07-26T21:58:56-07:00
documentation
PRO PIPE
is_lateral_inspection
false