Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 27, 2022, 10:01 AM
  • H 0329_H 0328_07272022_032108.mp4

Date
07/27/2022
W/O
961907
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00175
PipeID
P10779
Time
3:01 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9992
Sewer Name
H JOINT OUTFALL H - UNIT 4
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_961907_TV02325_JUL2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Width
57 in.
Upstream MH
H 0329
Downstream MH
H 0328
Dir. of Survey
Downstream
Length Surveyed
576.7 ft.
Total Length
576.7 ft.
Structural Index
3
Structural Quick
3V00
Structural Rating
345
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
349
Pipe schematic from manhole H 0329 to H 0328
MH: H 0329MH: H 0328downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 03290 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COATING2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start576.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish576.7 ft. AMH - Downstream Manhole, Survey Ends - H 0328

Observation photos (2)

  • General Observation - MAG COATING

    2 ft. - General Observation - MAG COATING

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
576.6SAP
576.7AMHH 0328
0AMHH 0329
0MWM
2MGOMAG COATING
0MWL
2SAP

Properties (7)

additional_info
630074072622202
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2022-07-27T03:01:06-07:00
documentation
PRO PIPE
is_lateral_inspection
false