Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 3, 2022, 08:49 AM
  • B 1099_B 1516_08032022_020125.mp4

Date
08/03/2022
W/O
962226
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01130
PipeID
P25643
Time
1:49 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10309
Sewer Name
B JOINT OUTFALL B - UNIT 6G CONNECTION
City
ALHAMBRA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
23
Purpose
Routine Assessment
Project
WO_962226_TV16040_JUL2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
B 1516
Downstream MH
B 1099
Dir. of Survey
Upstream
Length Surveyed
91.1 ft.
Total Length
91.1 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole B 1516 to B 1099
MH: B 1516MH: B 1099upstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - B 10990 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - COCKROACHES IN MH0 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS0.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0.1 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish0.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish4.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"45.9 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start66.2 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"77.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start89.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start91.1 ft. AMH - Downstream Manhole, Survey Begins - B 151691.1 ft. MWL - Water Level, 5 %of cross sectional area91.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (5)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    13.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    45.2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    91.1 ft. - General Observation - COCKROACHES IN MH

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - DEBRIS

    91.1 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS

Observations (16)

DistanceCodeObservation
45.2SRV
91.1MGOCONNECTION AT MH 9 O'CLOCK
2SAP
86.5TFA
91.1AMHB 1099
0AMHB 1516
91.1MGOCONNECTION AT MH 3 O'CLOCK
91SSS
24.9TBA
91.1MGOCOCKROACHES IN MH
0MWL
91SRV
91.1DSZDEBRIS
0MGOCONNECTION AT MH 9 O'CLOCK
13.2SSS
91SAP

Properties (8)

additional_info
630074080222203
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-08-03T01:49:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
31495