Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2022, 04:55 AM
  • 05 1487_05 1486_06202022_230759.mp4

Date
06/20/2022
W/O
956732
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06713
Time
9:55 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10183
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_956732_TV05300_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
24 in.
Upstream MH
05 1487
Downstream MH
05 1486
Dir. of Survey
Downstream
Length Surveyed
294.1 ft.
Total Length
294.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 1487 to 05 1486
MH: 05 1487MH: 05 1486downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 14872.1 ft. MGO - General Observation - MAG COAT2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start81.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"293.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish293.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish294.1 ft. MGO - General Observation - CONNECTION AT MH 9'OCLOCK CAPPED294.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK294.1 ft. AMH - Downstream Manhole, Survey Ends - 05 1486

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2.1MGOMAG COAT
81.4TFC
2.1SSS
293.4SAP
0MWL
0MWM
294.1MGOCONNECTION AT MH 9'OCLOCK CAPPED
294.1MGOCONNECTION AT MH 3 O'CLOCK
0AMH05 1487
238.1TF
2.1SAP
293.4SSS
294.1AMH05 1486

Properties (7)

additional_info
630074062022201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-06-20T21:55:37-07:00
documentation
PROPIPE
is_lateral_inspection
false