Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2022, 05:08 AM
  • 05 1486_05 1485_06202022_231931.mp4

Date
06/20/2022
W/O
956732
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06712
Time
10:08 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10183
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_956732_TV05300_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
24 in.
Upstream MH
05 1486
Downstream MH
05 1485
Dir. of Survey
Downstream
Length Surveyed
231.3 ft.
Total Length
231.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 1486 to 05 1485
MH: 05 1486MH: 05 1485downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9'OCLOCK CAPPED0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 05 14862.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start64.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"65.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"71.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"128.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"178 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"190.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"190.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"228.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish228.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish231.3 ft. AMH - Downstream Manhole, Survey Ends - 05 1485

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
71.3TFA
0MWL
2.3SAP
64.8TFC
178TFC
65.6TF
0MWM
190.2TF
228.2SAP
128.3TF
0MGOCONNECTION AT MH 9'OCLOCK CAPPED
190.2TF
2.3SSS
0MGOCONNECTION AT MH 3 O'CLOCK
0AMH05 1486
231.3AMH05 1485
228.2SSS

Properties (7)

additional_info
630074062022201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-06-20T22:08:17-07:00
documentation
PROPIPE
is_lateral_inspection
false