Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2022, 05:31 AM
  • 05 1484_05 2341_06202022_234525.mp4

Date
06/20/2022
W/O
956732
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06710
Time
10:31 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10183
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_956732_TV05300_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
24 in.
Upstream MH
05 1484
Downstream MH
05 2341
Dir. of Survey
Downstream
Length Surveyed
334.5 ft.
Total Length
334.5 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 1484 to 05 2341
MH: 05 1484MH: 05 2341downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 14843.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start52.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"83.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"129 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"187 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"190.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"201.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"248.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"280 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"333.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish334.5 ft. AMH - Downstream Manhole, Survey Ends - 05 2341334.5 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
333.5SAP
0MGOCONNECTION AT MH 9 O'CLOCK
0MGOCONNECTION AT MH 3 O'CLOCK
201.2TFC
0MWM
187TF
3.7SAP
129TF
334.5AMH05 2341
333.5SSS
52.6TFC
3.7SSS
190.1TFA
334.5MGOCONNECTION AT MH 9 O'CLOCK
248.6TF
83.6TF
280TF
0MWL
0AMH05 1484

Properties (7)

additional_info
630074062022201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-06-20T22:31:38-07:00
documentation
PROPIPE
is_lateral_inspection
false