Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 16, 2022, 02:52 PM
  • 05 1482_05 1481A_06162022_090130.mp4

Date
06/16/2022
W/O
956732
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06707
Time
7:52 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10175
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_956732_TV05300_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
21 in.
Upstream MH
05 1481A
Downstream MH
05 1482
Dir. of Survey
Upstream
Length Surveyed
210.3 ft.
Total Length
210.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 1481A to 05 1482
MH: 05 1481AMH: 05 1482upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 14820 ft. MGO - General Observation - CONNECTION AT MH 9'OCLOCK CAPPED1.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish28.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"97.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"180.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"206 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start206 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start210.3 ft. MWM - Water Mark, 10 %of cross sectional area210.3 ft. MWL - Water Level, 5 %of cross sectional area210.3 ft. AMH - Downstream Manhole, Survey Begins - 05 1481A210.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
4.3SSS
210.3AMH05 1482
0MWM
0MWL
208.8SSS
0AMH05 1481A
4.3SAP
181.7TFC
112.7TFC
0MGOCONNECTION AT MH 3 O'CLOCK
210.3MGOCONNECTION AT MH 9'OCLOCK CAPPED
29.6TFC
208.8SAP

Properties (7)

additional_info
630074061622061
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-06-16T07:52:38-07:00
documentation
PROPIPE
is_lateral_inspection
false