Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 20, 2022, 09:26 AM
  • 05 2330_05 1472_06202022_035121.mp4

Date
06/20/2022
W/O
956732
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06696
Time
2:26 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10182
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_956732_TV05300_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
05 2330
Downstream MH
05 1472
Dir. of Survey
Downstream
Length Surveyed
257.2 ft.
Total Length
257.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 2330 to 05 1472
MH: 05 2330MH: 05 1472downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 05 23300 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"96.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"179.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"255.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish256.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish257.2 ft. AMH - Downstream Manhole, Survey Ends - 05 1472257.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
179.4TF
0MGOCONNECTION AT MH 3 O'CLOCK
0AMH05 2330
257.2AMH05 1472
255.5SAP
0MWL
96.9TF
2.2SSS
5.6TF
256.6SSS
257.2MGOCONNECTION AT MH 3 O'CLOCK CAPPED
2.2SAP
0MWM

Properties (7)

additional_info
630074062022001
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-06-20T02:26:54-07:00
documentation
PROPIPE
is_lateral_inspection
false