Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 16, 2022, 03:39 PM
  • 05 1480_05 1479_06162022_095212.mp4

Date
06/16/2022
W/O
956732
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06704
Time
8:39 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10175
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_956732_TV05300_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
27 in.
Upstream MH
05 1480
Downstream MH
05 1479
Dir. of Survey
Downstream
Length Surveyed
322.4 ft.
Total Length
322.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 1480 to 05 1479
MH: 05 1480MH: 05 1479downstream0 ft. MWM - Water Mark, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 14800 ft. MWL - Water Level, 5 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start86.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"168.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"218.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"242.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"320.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish320.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED322.4 ft. AMH - Downstream Manhole, Survey Ends - 05 1479

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2.1SAP
168.5TFC
320.9SSS
0MWM
320.9SAP
322.4MGOCONNECTION AT MH 3 O'CLOCK CAPPED
218.3TFA
2.1SSS
242.2TFA
86.7TFA
322.4AMH05 1479
0AMH05 1480
0MWL

Properties (7)

additional_info
630074061622061
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-06-16T08:39:47-07:00
documentation
PROPIPE
is_lateral_inspection
false