Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 20, 2022, 10:51 AM
  • 05 1473_05 2330_06202022_045603.mp4

Date
06/20/2022
W/O
956732
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06697
Time
3:51 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10182
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_956732_TV05300_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
05 2330
Downstream MH
05 1473
Dir. of Survey
Upstream
Length Surveyed
63.9 ft.
Total Length
63.9 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 2330 to 05 1473
MH: 05 2330MH: 05 1473upstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MGO - General Observation - CONNECTION AT MH 9'OCLOCK CAPPED0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 05 147361.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start61.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start63.9 ft. MWM - Water Mark, 25 %of cross sectional area63.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK63.9 ft. AMH - Downstream Manhole, Survey Begins - 05 233063.9 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWM
0MGOCONNECTION AT MH 9 O'CLOCK
2.1SSS
0AMH05 2330
63.9MGOCONNECTION AT MH 3 O'CLOCK
0MWL
63.9SAP
63.9MGOCONNECTION AT MH 9'OCLOCK CAPPED
63.9SSS
63.9AMH05 1473
2.1SAP

Properties (7)

additional_info
630074062022001
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-06-20T03:51:13-07:00
documentation
PROPIPE
is_lateral_inspection
false