Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 20, 2022, 08:07 AM
  • 05 1469_05 1468_06202022_022309.mp4

Date
06/20/2022
W/O
956732
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06691
Time
1:07 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10182
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_956732_TV05300_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
05 1469
Downstream MH
05 1468
Dir. of Survey
Downstream
Length Surveyed
326.4 ft.
Total Length
326.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 1469 to 05 1468
MH: 05 1469MH: 05 1468downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED0 ft. AMH - Upstream Manhole, Survey Begins - 05 14693 ft. MGO - General Observation - MAG COAT6.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"64.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"115.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"164.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"167.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"216.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"263.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"315.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"324.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish326.4 ft. AMH - Downstream Manhole, Survey Ends - 05 1468326.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
115.6TFC
326.4AMH05 1468
324.3SSS
0MWL
263.8TFC
167.3TFC
315.1TFC
6.3SAP
216.1TFC
0MWM
6.3SSS
10.5TFC
0MGOCONNECTION AT MH 3 O'CLOCK CAPPED
64.9TFC
0AMH05 1469
324.2SAP
326.4MGOCONNECTION AT MH 3 O'CLOCK CAPPED
164.6TFC
3MGOMAG COAT

Properties (7)

additional_info
630074062022001
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-06-20T01:07:51-07:00
documentation
PROPIPE
is_lateral_inspection
false