Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2022, 07:57 AM
  • 02 1160_02 1159_07282022_011539.mp4

Date
07/28/2022
W/O
961777
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00351
PipeID
P02944
Time
12:57 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9996
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_961777_TV02244_JUL2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
39 in.
Upstream MH
02 1160
Downstream MH
02 1159
Dir. of Survey
Downstream
Length Surveyed
324.5 ft.
Total Length
324.5 ft.
Structural Index
3
Structural Quick
413K
Structural Rating
200
O&M Index
3
O&M Quick
4133
O&M Rating
13
Overall Index
3
Overall Quick
Overall Rating
213
Pipe schematic from manhole 02 1160 to 02 1159
MH: 02 1160MH: 02 1159downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 11600 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area7.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES13.3 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES19.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start42.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"91.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"264.2 ft. FS - Fracture Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES268.1 ft. MWLS - Water Level, Sag in pipe, 30 %of cross sectional area, Start273.6 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start289.6 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish289.6 ft. MWLS - Water Level, Sag in pipe, 30 %of cross sectional area, Finish293.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES308.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"319.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1159

Observation photos (7)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    7.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES

    13.3 ft. - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    19.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES

    264.2 ft. - Fracture Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 30 %of cross sectional area, Start

    268.1 ft. - Water Level, Sag in pipe, 30 %of cross sectional area, Start

  • Deposits Attached Grease, 15 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    273.6 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    293.3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
273.6DAGS
91.4TFC
0AMH02 1160
319.7CM
0MWM
308.9TFC
19.6CM
13.3CL
289.6DAGS
268.1MWLS
7.2CM
0MWL
289.6MWLS
293.3FM
42.4TFA
324.5AMH02 1159
264.2FS

Properties (7)

additional_info
630098072722203
custom_field_three
FRACTURES, SAG
custom_field_two
2
customer
1
datetime
2022-07-28T00:57:35-07:00
documentation
PRO PIPE
is_lateral_inspection
false