Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 29, 2022, 07:03 AM
  • 15 0590_B 0769_07292022_001549.mp4

Date
07/29/2022
W/O
962227
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00613
PipeID
P12521
Time
12:03 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10303
Sewer Name
15 LOWER AZUSA ROAD TRUNK
City
EL MONTE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
WO_962227_TV15097_JUL2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0590
Downstream MH
B 0769
Dir. of Survey
Downstream
Length Surveyed
197.6 ft.
Total Length
197.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 15 0590 to B 0769
MH: 15 0590MH: B 0769downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MH0 ft. AMH - Upstream Manhole, Survey Begins - 15 05900 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start48.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.6 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"51.6 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"76.9 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"103 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"106.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"127.3 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"191.6 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"196.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish196.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish196.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish197.7 ft. MGO - General Observation - COCKROACHES IN MH197.7 ft. MGO - General Observation - STOP LOG CONNECTION AT MH 12 O'CLOCK197.7 ft. AMH - Downstream Manhole, Survey Ends - B 0769

Observation photos (5)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    197.7 ft. - General Observation - COCKROACHES IN MH

Observations (23)

DistanceCodeObservation
51.6TBA
103TFC
51.6TFC
0MWL
196.8DAGS
196.7SSS
2DAGS
124.1TFC
191.6TBA
0MGOCOCKROACHES IN MH
197.7MGOCOCKROACHES IN MH
196.8SAP
76.9TBA
106.7TBA
197.7MGOSTOP LOG CONNECTION AT MH 12 O'CLOCK
0AMH15 0590
197.7AMHB 0769
0MWM
0MGOCONNECTION AT MH 3 O'CLOCK
2SAP
127.3TBA
2SSS
48.8TFC

Properties (7)

additional_info
630074072822203
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
3
customer
1
datetime
2022-07-29T00:03:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false