Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 29, 2022, 05:00 AM
  • 18 0868_18 0867_06282022_235816.mp4

Date
06/28/2022
W/O
956734
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00709
PipeID
P14720
Time
10:00 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10212
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
SANTA FE SPRINGS
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
35
Purpose
Routine Assessment
Project
WO_956734_TV18101_JUN2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
18 0868
Downstream MH
18 0867
Dir. of Survey
Downstream
Length Surveyed
543.9 ft.
Total Length
543.9 ft.
Structural Index
4
Structural Quick
5U3T
Structural Rating
861
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
861
Pipe schematic from manhole 18 0868 to 18 0867
MH: 18 0868MH: 18 0867downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 08682 ft. MGO - General Observation - MAG COATING2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start116.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"147.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"261 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"277.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"306.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"353 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"369.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"409.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"538.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish540.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish543.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0867

Observation photos (3)

  • General Observation - MAG COATING

    2 ft. - General Observation - MAG COATING

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
2MGOMAG COATING
147.3TBA
0MWL
306.7TFC
409.8TFA
538.8SAP
543.9AMH18 0867
353TFC
2SAP
0MWM
277.1TFC
2SRV
116.7TFA
540.6SRV
0AMH18 0868
369.8TFC
261TBA

Properties (6)

additional_info
630098062822201
custom_field_two
2
customer
1
datetime
2022-06-28T22:00:49-07:00
documentation
PRO PIPE
is_lateral_inspection
false