Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 1, 2022, 07:39 AM
  • 02 1032_02 1031_07012022_020321.mp4

Date
07/01/2022
W/O
957217
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00280
PipeID
P03606
Time
12:39 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10199
Sewer Name
02 MONTEBELLO CITY TRUNK
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
WO_957217_TV02295_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
24 in.
Upstream MH
02 1032
Downstream MH
02 1031
Dir. of Survey
Downstream
Length Surveyed
329.5 ft.
Total Length
329.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
323
O&M Index
2
O&M Quick
2500
O&M Rating
10
Overall Index
2
Overall Quick
Overall Rating
333
Pipe schematic from manhole 02 1032 to 02 1031
MH: 02 1032MH: 02 1031downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 10320 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK2.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - MAG COAT8.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start39.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"47.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"94.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"96.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"142.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"145.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"195.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"198.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"236.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"247.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"296.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"299 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"302.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start - DSZ327.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish - DSZ328.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK (UNKNOWN FLOW ACTIVITY.)328.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK (UNKNOWN FLOW ACTIVITY.)328.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish328.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1031

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (26)

DistanceCodeObservation
0AMH02 1032
247.2TFC
96.5TFC
39.9TFC
145.7TFC
94.3TFC
142.7TFC
328.4SSS
328.4SAV
329.5AMH02 1031
0MWM
8.9SSS
299TFC
47.6TFC
0MWL
328.3MGOCONNECTION AT MH 9 O'CLOCK (UNKNOWN FLOW ACTIVITY.)
302.4DSZDSZ
236.9TFC
2.4SAV
328.3MGOCONNECTION AT MH 3 O'CLOCK (UNKNOWN FLOW ACTIVITY.)
198.1TFC
296.6TFC
2.4MGOMAG COAT
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
327.4DSZDSZ
195.4TFC

Properties (7)

additional_info
630074063022213
custom_field_three
SPALLING, AGGREGATE VISIBLE
custom_field_two
2
customer
1
datetime
2022-07-01T00:39:25-07:00
documentation
PROPIPE
is_lateral_inspection
false