Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 7, 2022, 09:42 AM
  • B 0440_B 0439_07072022_035216.mp4

Date
07/07/2022
W/O
956736
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00093
PipeID
P08952
Time
2:42 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10225
Sewer Name
B JOINT OUTFALL B - UNIT 5C
City
PASADENA
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_956736_TV16034_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
57 in.
Upstream MH
B 0440
Downstream MH
B 0439
Dir. of Survey
Downstream
Length Surveyed
356.3 ft.
Total Length
356.3 ft.
Structural Index
3
Structural Quick
3M2L
Structural Rating
344
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
484
Pipe schematic from manhole B 0440 to B 0439
MH: B 0440MH: B 0439downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 04400 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start18.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start354 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish354 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish354 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish356.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE356.3 ft. AMH - Downstream Manhole, Survey Ends - B 0439

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    18.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    356.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
0MWL
0AMHB 0440
2DAGS
356.3MGOCOCKROACHES IN MANHOLE
354DAGS
0MGOCONNECTION AT MH 3 O'CLOCK
0MWM
356.3AMHB 0439
0MGOCOCKROACHES IN MANHOLE
2SAP
354SAP
18.7SSS
354SSS

Properties (7)

additional_info
630098070622202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-07-07T02:42:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false