Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2022, 08:37 AM
  • A 0374_A 0373_06282022_014237.mp4

Date
06/28/2022
W/O
956833
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00325
PipeID
P08284
Time
1:37 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10210
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
SAN GABRIEL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Routine Assessment
Project
RFIR_WO_956833_TV15260_JUN2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
39 in.
Upstream MH
A 0373
Downstream MH
A 0374
Dir. of Survey
Upstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole A 0373 to A 0374
MH: A 0373MH: A 0374upstream0 ft. MSA - Survey Abandoned - DUE TO FLOW0 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES0 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES2 ft. AMH - Downstream Manhole, Survey Begins - A 03732 ft. MWL - Water Level, 25 %of cross sectional area2 ft. MWM - Water Mark, 50 %of cross sectional area

Observation photos (4)

  • Survey Abandoned - DUE TO FLOW

    2 ft. - Survey Abandoned - DUE TO FLOW

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES

Observations (7)

DistanceCodeObservation
2MSADUE TO FLOW
0AMHA 0373
2SAV
0MWL
0MWM
2SSS
2DAGS

Properties (8)

additional_info
630098062722201
custom_field_three
ABANDONED DUE TO HEAVY FLOW
custom_field_two
5
customer
1
datetime
2022-06-28T01:37:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
29462