A 0381A_A 0380_07202022_034454.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
14.1 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
14.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
34.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
122.9 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES
171.1 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 14.1 | SAV | — |
| 291.7 | SAP | — |
| 0 | AMH | A 0381A |
| 34.6 | SAV | — |
| 2 | DAGS | — |
| 293.9 | AMH | A 0380 |
| 291.7 | SRV | — |
| 291.7 | SSS | — |
| 171.1 | SRV | — |
| 0 | MWL | — |
| 14.1 | SSS | — |
| 0 | MWM | — |
| 122.9 | SRV | — |
| 291.7 | DAGS | — |
| 34.6 | SAP | — |