Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2022, 07:02 AM
  • A 0375_A 0374_06282022_010208.mp4

Date
06/28/2022
W/O
956833
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00325
PipeID
P08285
Time
12:02 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10210
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
SAN GABRIEL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Routine Assessment
Project
RFIR_WO_956833_TV15260_JUN2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
39 in.
Upstream MH
A 0375
Downstream MH
A 0374
Dir. of Survey
Downstream
Length Surveyed
716.8 ft.
Total Length
716.8 ft.
Structural Index
3
Structural Quick
5M3V
Structural Rating
927
O&M Index
2
O&M Quick
412[
O&M Rating
288
Overall Index
3
Overall Quick
Overall Rating
1215
Pipe schematic from manhole A 0375 to A 0374
MH: A 0375MH: A 0374downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 03750 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start33.3 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start375 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish375 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish375 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish375 ft. MMC - Material Change, Vitrified clay pipe500.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start500.6 ft. MMC - Material Change, Reinforced concrete pipe506.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start714 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish714 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish714 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish716.8 ft. AMH - Downstream Manhole, Survey Ends - A 0374

Observation photos (8)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    33.3 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Vitrified clay pipe

    375 ft. - Material Change, Vitrified clay pipe

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    500.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Reinforced concrete pipe

    500.6 ft. - Material Change, Reinforced concrete pipe

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    506.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
2SAP
375SAP
2SSS
714SAP
2DAGS
375SSS
716.8AMHA 0374
33.3SRV
0AMHA 0375
500.6SSS
714SSS
375SRV
0MWM
500.6MMC
714DAGS
0MWL
506.4SAP
375MMC

Properties (8)

additional_info
630098062722201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-06-28T00:02:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
29462