Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 20, 2022, 06:16 AM
  • 18 0619_18 0618_07192022_232907.mp4

Date
07/19/2022
W/O
956997
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00692
PipeID
P14469
Time
11:16 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10236
Sewer Name
18 NORTH PLANT OUTFALL RELIEF TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_956997_TV18033_JUN2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0619
Downstream MH
18 0618
Dir. of Survey
Downstream
Length Surveyed
305.9 ft.
Total Length
305.9 ft.
Structural Index
3
Structural Quick
5K3K
Structural Rating
600
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
600
Pipe schematic from manhole 18 0619 to 18 0618
MH: 18 0619MH: 18 0618downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 06190 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start55.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"71 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"144.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"281.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"303 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish303 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish303 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish305.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0618305.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0AMH18 0619
303SRV
281.6TFA
305.9AMH18 0618
305.9MGOCONNECTION AT MH 9 O'CLOCK
303SSS
71TFC
144.2TFA
55.4TFA
303SAP
2SSS
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
2SRV
2SAP
0MWL

Properties (7)

additional_info
630098071922201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-07-19T23:16:05-07:00
documentation
PRO PIPE
is_lateral_inspection
false