Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2022, 09:28 AM
  • B 0409_B 0408_06282022_034640.mp4

Date
06/28/2022
W/O
956993
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00092
PipeID
P08921
Time
2:28 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10211
Sewer Name
B JOINT OUTFALL B - UNIT 5B
City
ARCADIA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_956993_TV15053_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
57 in.
Upstream MH
B 0409
Downstream MH
B 0408
Dir. of Survey
Downstream
Length Surveyed
401.6 ft.
Total Length
401.6 ft.
Structural Index
4
Structural Quick
5N3O
Structural Rating
609
O&M Index
2
O&M Quick
2O00
O&M Rating
158
Overall Index
3
Overall Quick
Overall Rating
767
Pipe schematic from manhole B 0409 to B 0408
MH: B 0409MH: B 0408downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 04090 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start10.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"31.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"88.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"112.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"169.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"217.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"250.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"254 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"307.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"315 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"392.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish398.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish398.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish401.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE401.6 ft. AMH - Downstream Manhole, Survey Ends - B 0408

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.9 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    401.6 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (22)

DistanceCodeObservation
401.6MGOCOCKROACHES IN MANHOLE
398.7DAGS
169.5TFC
0MWL
217.4TFC
88.7TF
2DAGS
254TB
392.9SRV
0AMHB 0409
15.9SRV
0MWM
10.4SAP
398.7SAP
401.6AMHB 0408
177.7TB
112.3TFC
15.9TFC
307.5TF
31.5TFC
315TF
250.6TFC

Properties (7)

additional_info
630098062722202
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-06-28T02:28:54-07:00
documentation
PRO PIPE
is_lateral_inspection
false