Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2022, 04:26 AM
  • 01 0268_01 0267_06272022_224525.mp4

Date
06/27/2022
W/O
956731
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01316
Time
9:26 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10190
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
SOUTH LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_956731_TV01204_JUN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
18 in.
Upstream MH
01 0268
Downstream MH
01 0267
Dir. of Survey
Downstream
Length Surveyed
329.3 ft.
Total Length
329.3 ft.
Structural Index
3
Structural Quick
4L2L
Structural Rating
394
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
3
Overall Quick
Overall Rating
524
Pipe schematic from manhole 01 0268 to 01 0267
MH: 01 0268MH: 01 0267downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 02680 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES83.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"147.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN176.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN206.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN239.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"268.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"326.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish329.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE329.3 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED329.3 ft. AMH - Downstream Manhole, Survey Ends - 01 0267

Observation photos (2)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    3.6 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
326.4FM
0AMH01 0268
0MWL
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MGOROACHES @ MH
206.5TFOPEN
83.9TFC
329.3MGOCONN @ MH 3 O'CLOCK/ACTIVE
2FM
2SSS
329.3MGOCONN @ MH 9 O'CLOCK/CAPPED
0MWM
239.2TFC
268.7TFC
327SSS
327DAGS
3.6FM
147.1TFOPEN
2DAGS
176.8TFOPEN
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
329.3AMH01 0267

Properties (7)

additional_info
630074062722201
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2022-06-27T21:26:47-07:00
documentation
PROPIPE
is_lateral_inspection
false