Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2022, 04:49 AM
  • 01 0266B_01 0266A_06272022_225706.mp4

Date
06/27/2022
W/O
956731
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01314
Time
9:49 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10190
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
SOUTH LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_956731_TV01204_JUN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
18 in.
Upstream MH
01 0266B
Downstream MH
01 0266A
Dir. of Survey
Downstream
Length Surveyed
148.7 ft.
Total Length
148.7 ft.
Structural Index
3
Structural Quick
4E2E
Structural Rating
174
O&M Index
2
O&M Quick
2E00
O&M Rating
58
Overall Index
3
Overall Quick
Overall Rating
232
Pipe schematic from manhole 01 0266B to 01 0266A
MH: 01 0266BMH: 01 0266Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 0266B0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"55.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"88 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"114.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"126.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN146 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish146 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish147.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"148.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish148.7 ft. AMH - Downstream Manhole, Survey Ends - 01 0266A148.7 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE148.7 ft. MGO - General Observation - MOBILE MMS - 149.06'

Observation photos (2)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    126.4 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (19)

DistanceCodeObservation
2SSS
148.7AMH01 0266A
2DAGS
148.7MGOCONN @ MH 9 O'CLOCK/ACTIVE
0AMH01 0266B
114.6TFA
2.8FM
55.3TFC
147.1TFC
0MWM
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
146SSS
126.4TBOPEN
148.6FM
88TFC
146DAGS
26.2TFC
148.7MGOMOBILE MMS - 149.06'
0MWL

Properties (7)

additional_info
630074062722201
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2022-06-27T21:49:42-07:00
documentation
PROPIPE
is_lateral_inspection
false