Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2022, 07:34 AM
  • 01 0261_01 0260_06282022_014717.mp4

Date
06/28/2022
W/O
956731
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01307
Time
12:34 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10190
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
SOUTH LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_956731_TV01204_JUN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
01 0261
Downstream MH
01 0260
Dir. of Survey
Downstream
Length Surveyed
321.4 ft.
Total Length
321.4 ft.
Structural Index
3
Structural Quick
4L2L
Structural Rating
378
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
3
Overall Quick
Overall Rating
504
Pipe schematic from manhole 01 0261 to 01 0260
MH: 01 0261MH: 01 0260downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 01 02610 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start62 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"102 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN183.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN222.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN261.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"319 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish319 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish321 ft. MGO - General Observation - ROACHES @ MH321.4 ft. AMH - Downstream Manhole, Survey Ends - 01 0260321.4 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (2)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    62 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

Observations (20)

DistanceCodeObservation
183.1TFOPEN
319SSS
321MGOROACHES @ MH
0MWM
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
319DAGS
222.3TFOPEN
0AMH01 0261
62TBA
261.3TFC
319FM
140.8TFOPEN
102TFC
321.4AMH01 0260
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
2DAGS
2SSS
321.4MGOCONN @ MH 3 O'CLOCK/ACTIVE
6.1FM
0MWL

Properties (7)

additional_info
630074062722201
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2022-06-28T00:34:27-07:00
documentation
PROPIPE
is_lateral_inspection
false