Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2022, 06:07 AM
  • 01 0260_01 0259_06282022_004017.mp4

Date
06/27/2022
W/O
956731
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01306
Time
11:07 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10190
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
SOUTH LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_956731_TV01204_JUN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
01 0260
Downstream MH
01 0259
Dir. of Survey
Downstream
Length Surveyed
316.5 ft.
Total Length
316.5 ft.
Structural Index
3
Structural Quick
4K2X
Structural Rating
496
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
3
Overall Quick
Overall Rating
620
Pipe schematic from manhole 01 0260 to 01 0259
MH: 01 0260MH: 01 0259downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 02600 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start96.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"138 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN175.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"211.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"252.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN313.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish314 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish314 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish314 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish316.5 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE316.5 ft. AMH - Downstream Manhole, Survey Ends - 01 0259

Observation photos (1)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
2SSS
252.9TFOPEN
316.5MGOCONN @ MH 3 O'CLOCK/ACTIVE
0AMH01 0260
96.2TFA
0MWM
138TFOPEN
175.1TFC
3.1FM
314MWLS
2MWLS
314SSS
211.7TFA
316.5AMH01 0259
313.6FM
0MWL
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
2DAGS
314DAGS

Properties (7)

additional_info
630074062722201
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2022-06-27T23:07:28-07:00
documentation
PROPIPE
is_lateral_inspection
false