Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2022, 09:52 AM
  • 01 0239_01 0238_06282022_040613.mp4

Date
06/28/2022
W/O
956731
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01284
Time
2:52 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10190
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
SOUTH LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_956731_TV01204_JUN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
12 in.
Upstream MH
01 0239
Downstream MH
01 0238
Dir. of Survey
Downstream
Length Surveyed
308.5 ft.
Total Length
308.5 ft.
Structural Index
3
Structural Quick
4K3K
Structural Rating
545
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
3
Overall Quick
Overall Rating
667
Pipe schematic from manhole 01 0239 to 01 0238
MH: 01 0239MH: 01 0238downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02390 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"27.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"57.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN88 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"96.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN109.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN134.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"137.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN166.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"187.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN190.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"220.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN237.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"255.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN279.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN291.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"306 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish306 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish306 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish306 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish308 ft. MGO - General Observation - ROACHES @ MH308.5 ft. AMH - Downstream Manhole, Survey Ends - 01 0238308.5 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (5)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

    27.9 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    109.1 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    137.7 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

    190.4 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

Observations (31)

DistanceCodeObservation
96.4TFOPEN
88TFC
279.1TFOPEN
137.7TBOPEN
109.1TBOPEN
220.1TFOPEN
7.5TFC
5.8FM
57.9TFOPEN
308.5AMH01 0238
134.9TFC
0MGOCONNECTION AT MH 9 O'CLOCK
291.1TFC
306SSS
308.5MGOCONN @ MH 3 O'CLOCK/ACTIVE
187.6TFOPEN
306FM
27.9TBA
237.2TBA
190.4TBA
166.9TFC
2CM
0MWL
0AMH01 0239
2DAGS
306CM
0MWM
255.5TFOPEN
306DAGS
2SSS
308MGOROACHES @ MH

Properties (7)

additional_info
630074062722201
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2022-06-28T02:52:55-07:00
documentation
PROPIPE
is_lateral_inspection
false