Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 30, 2022, 06:45 AM
  • 19 0213_19 0212_06302022_005706.mp4

Date
06/29/2022
W/O
956995
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00718
PipeID
P15182
Time
11:45 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10194
Sewer Name
19 ARTESIA-CERRITOS TRUNK
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_956995_TV19059_JUN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
19 0213
Downstream MH
19 0212
Dir. of Survey
Downstream
Length Surveyed
264.7 ft.
Total Length
264.7 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
260
Pipe schematic from manhole 19 0213 to 19 0212
MH: 19 0213MH: 19 0212downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 19 02130 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"67.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"86 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"96.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"119.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"149.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"168.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"186.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"204 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES217.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"230.8 ft. FL - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES259.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish262 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish264.7 ft. AMH - Downstream Manhole, Survey Ends - 19 0212264.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    204 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES

    230.8 ft. - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
149.7TF
67.5TFC
119.2TFC
264.7AMH19 0212
7.9CM
262SSS
259.6CM
17.2TFC
0MGOCONNECTION AT MH 3 O'CLOCK
217.5TFC
2SSS
186.8TF
96.5TF
0MGOCONNECTION AT MH 9 O'CLOCK
264.7MGOCONNECTION AT MH 9 O'CLOCK
0AMH19 0213
86TF
230.8FL
204FL
0MWL
168.3TFC
0MWM

Properties (7)

additional_info
630074062922202
custom_field_three
MULTIPLE CRACKS
custom_field_two
2
customer
1
datetime
2022-06-29T23:45:37-07:00
documentation
PROPIPE
is_lateral_inspection
false