Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 5, 2022, 09:26 AM
  • F 0080_F 0079_07052022_040431.mp4

Date
07/05/2022
W/O
956835
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00043
PipeID
P10284
Time
2:26 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10200
Sewer Name
F JOINT OUTFALL F - UNIT 7A
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
RFIR_WO_956835_TV02203_JUN2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
33 in.
Upstream MH
F 0080
Downstream MH
F 0079
Dir. of Survey
Downstream
Length Surveyed
701.5 ft.
Total Length
701.5 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
15
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
15
Pipe schematic from manhole F 0080 to F 0079
MH: F 0080MH: F 0079downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 00802.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start157.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"159.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES696.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish696.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish701.5 ft. AMH - Downstream Manhole, Survey Ends - F 0079

Observation photos (4)

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

    2.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

    159.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (11)

DistanceCodeObservation
701.5AMHF 0079
696.9SSS
0MWL
696.3SAP
0MWM
159.1SRV
2.1SRV
0AMHF 0080
157.7TFA
2.1SSS
2.1SAP

Properties (7)

additional_info
630074070522001
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2022-07-05T02:26:54-07:00
documentation
PROPIPE
is_lateral_inspection
false