Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 5, 2022, 07:59 AM
  • C 0193_C 0192_852022_013149.mp4

Date
08/05/2022
W/O
0957067
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00124
PipeID
P09582
Time
12:59 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3170
Sewer Name
C JOINT OUTFALL C - UNIT 3E
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
19
Purpose
Capital Improvement Program Assesment
Project
20220805MDM_JOINT_OUTFALL_C_UNIT_3E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22.5 in.
Upstream MH
C 0192
Downstream MH
C 0193
Dir. of Survey
Upstream
Length Surveyed
176.8 ft.
Total Length
176.8 ft.
Structural Index
4
Structural Quick
4100
Structural Rating
4
O&M Index
4
O&M Quick
5146
O&M Rating
34
Overall Index
4
Overall Quick
Overall Rating
38
Pipe schematic from manhole C 0192 to C 0193
MH: C 0192MH: C 0193upstream0 ft. AMH - Upstream Manhole, Survey Ends - 1:55AM0.6 ft. MWL - Water Level, 90 %of cross sectional area0.6 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE6.7 ft. MGP - General Photograph - APPOX 2" SEPERATED LINER AT JOINT6.7 ft. LFZ - Lining Failure Other, from 08 to 04 o'clock, within 8 inches of joint: YES - SEPARATED LINER AT JOINT RCP EXPOSED APPOX 2"18.2 ft. LFZ - Lining Failure Other, from 10 to 04 o'clock, within 8 inches of joint: YES - SEPERATED LINER RCP EXPOSED APPOX 3"18.2 ft. SAM - Surface Aggregate Missing, from 10 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG19.2 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Finish - SLUDGE DEBRIE39.9 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Start - SLUDGE DEBRIE74.3 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES - SLUDGE DEBRIE101.3 ft. MWM - Water Mark, 60 %of cross sectional area101.4 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE101.4 ft. MWL - Water Level, 30 %of cross sectional area101.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE134.7 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE134.7 ft. MWL - Water Level, 50 %of cross sectional area134.7 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start - SLUDGE134.7 ft. MWM - Water Mark, 80 %of cross sectional area141.8 ft. MWL - Water Level, 40 %of cross sectional area147.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE163.3 ft. MGO - General Observation - WHITE BUILD-UP ON LINER168.8 ft. MGO - General Observation - PEP LINER GOOD COND176.8 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active176.8 ft. MWM - Water Mark, 50 %of cross sectional area176.8 ft. IR - Infiltration Runner, from 12 to 11 o'clock, within 8 inches of joint: NO - AROUND MH SHAFT176.8 ft. MWL - Water Level, 20 %of cross sectional area176.8 ft. AMH - Downstream Manhole, Survey Begins - 1:25AM176.8 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active

Observation photos (13)

  • Infiltration Runner, from 12 to 11 o'clock, within 8 inches of joint: NO - AROUND MH SHAFT

    0 ft. - Infiltration Runner, from 12 to 11 o'clock, within 8 inches of joint: NO - AROUND MH SHAFT

  • General Observation - PEP LINER GOOD COND

    8 ft. - General Observation - PEP LINER GOOD COND

  • General Observation - WHITE BUILD-UP ON LINER

    13.5 ft. - General Observation - WHITE BUILD-UP ON LINER

  • Deposits Settled Other,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE

    75.4 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE

  • Deposits Settled Other,  25 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES - SLUDGE DEBRIE

    102.5 ft. - Deposits Settled Other, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES - SLUDGE DEBRIE

  • Deposits Settled Other,  25 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO, Start - SLUDGE DEBRIE

    136.9 ft. - Deposits Settled Other, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Start - SLUDGE DEBRIE

  • Deposits Settled Other,  25 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO, Finish - SLUDGE DEBRIE

    157.6 ft. - Deposits Settled Other, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Finish - SLUDGE DEBRIE

  • Lining Failure Other, from 10 to 04 o'clock, within 8 inches of joint: YES - SEPERATED LINER  RCP EXPOSED APPOX 3"

    158.6 ft. - Lining Failure Other, from 10 to 04 o'clock, within 8 inches of joint: YES - SEPERATED LINER RCP EXPOSED APPOX 3"

  • Surface Aggregate Missing, from 10 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    158.6 ft. - Surface Aggregate Missing, from 10 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • General Photograph - APPOX 2" SEPERATED LINER AT JOINT

    170.1 ft. - General Photograph - APPOX 2" SEPERATED LINER AT JOINT

  • Lining Failure Other, from 08 to 04 o'clock, within 8 inches of joint: YES - SEPARATED LINER AT JOINT RCP  EXPOSED APPOX 2"

    170.1 ft. - Lining Failure Other, from 08 to 04 o'clock, within 8 inches of joint: YES - SEPARATED LINER AT JOINT RCP EXPOSED APPOX 2"

  • Water Level, 90 %of cross sectional area

    176.2 ft. - Water Level, 90 %of cross sectional area

  • Upstream Manhole, Survey Ends - 1:55AM

    176.8 ft. - Upstream Manhole, Survey Ends - 1:55AM

Observations (28)

DistanceCodeObservation
158.6LFZSEPERATED LINER RCP EXPOSED APPOX 3"
42.1DSZSLUDGE
176.2MWL
170.1MGPAPPOX 2" SEPERATED LINER AT JOINT
75.4DSZSLUDGE
42.1MWL
158.6SAMSEVERE AGG
102.5DSZSLUDGE DEBRIE
157.6DSZSLUDGE DEBRIE
75.4MWL
176.8AMH1:55AM
136.9DSZSLUDGE DEBRIE
75.4DSZSLUDGE
75.5MWM
35MWL
0MGOConn. @ Mh, 9 O' Clock. Active
0MWM
0IRAROUND MH SHAFT
42.1DSZSLUDGE
13.5MGOWHITE BUILD-UP ON LINER
8MGOPEP LINER GOOD COND
42.1MWM
0MWL
0AMH1:25AM
176.2DSZSLUDGE
170.1LFZSEPARATED LINER AT JOINT RCP EXPOSED APPOX 2"
0MGOConn. @ Mh, 3 O' Clock. Active
29.7DSZSLUDGE

Properties (5)

customer
LACSD
datetime
2022-08-05T00:59:40-07:00
documentation
MARTIN,OLIVER 111,BRAR,CASTILLO
is_lateral_inspection
false
lining
PEP