Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 8, 2022, 03:52 PM
  • 15 0261_15 0260_06082022_101106.mp4

Date
06/08/2022
W/O
951848
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00627
PipeID
P12184
Time
8:52 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10166
Sewer Name
15 SAN JOSE CREEK TRUNK
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
34
Purpose
Routine Assessment
Project
WO_951848_TV15133_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0261
Downstream MH
15 0260
Dir. of Survey
Downstream
Length Surveyed
442.6 ft.
Total Length
442.7 ft.
Structural Index
2
Structural Quick
5232
Structural Rating
368
O&M Index
2
O&M Quick
2Q00
O&M Rating
176
Overall Index
2
Overall Quick
Overall Rating
544
Pipe schematic from manhole 15 0261 to 15 0260
MH: 15 0261MH: 15 0260downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02610 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ABANDONED2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start68.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"125.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.9 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start140.9 ft. SAP - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Start143.9 ft. SAP - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish143.9 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish197.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"298.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"391.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"440 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish440 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish440 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish442.7 ft. AMH - Downstream Manhole, Survey Ends - 15 0260

Observation photos (2)

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    140.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    140.9 ft. - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0MWL
197.9TFC
140.9SRV
143.9SAP
0AMH15 0261
2SSS
2MWLS
440SSS
442.7AMH15 0260
298.7TFC
68.4TFC
140.9SAP
125.3TFC
143.9SRV
391.9TFC
0MWM
440MWLS
0MGOCONN @ MH 3 O'CLOCK/ABANDONED
440DAGS
2DAGS

Properties (7)

additional_info
630074060822061
custom_field_three
REINFORCEMENTCORRODED AND PROJECTING/AGGREGATE PRO
custom_field_two
2
customer
1
datetime
2022-06-08T08:52:33-07:00
documentation
PROPIPE
is_lateral_inspection
false