Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 9, 2022, 08:31 AM
  • 15 0237_15 0236_05092022_025529.mp4

Date
05/09/2022
W/O
951848
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00627
PipeID
P12159
Time
1:31 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10101
Sewer Name
15 SAN JOSE CREEK TRUNK
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
33
Purpose
Routine Assessment
Project
WO_951848_TV15133_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
15 0237
Downstream MH
15 0236
Dir. of Survey
Downstream
Length Surveyed
359.8 ft.
Total Length
359.8 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
355
O&M Index
2
O&M Quick
2R00
O&M Rating
192
Overall Index
2
Overall Quick
Overall Rating
547
Pipe schematic from manhole 15 0237 to 15 0236
MH: 15 0237MH: 15 0236downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02370 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start231.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS336.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"357 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish357 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish357.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish357.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish359.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0236359.8 ft. MGO - General Observation - ROACHES @ MH

Observation photos (3)

  • General Observation - 65% MAG COAT

    2 ft. - General Observation - 65% MAG COAT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    359.8 ft. - General Observation - ROACHES @ MH

Observations (15)

DistanceCodeObservation
2SSS
0MWM
357.7DAGS
357SAP
359.8AMH15 0236
2SAP
0AMH15 0237
231.7DSZDEBRIS
2MGO65% MAG COAT
336.3TFC
357SSS
357.7DSZ
359.8MGOROACHES @ MH
2DAGS
0MWL

Properties (7)

additional_info
630138050922001
custom_field_three
MAG COATING
custom_field_two
2
customer
1
datetime
2022-05-09T01:31:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false