Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 25, 2022, 10:04 AM
  • 15 0229_15 0228_05252022_041754.mp4

Date
05/25/2022
W/O
951848
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00627
PipeID
P12151
Time
3:04 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10127
Sewer Name
15 SAN JOSE CREEK TRUNK
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
02
Purpose
Routine Assessment
Project
WO_951848_TV15133_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
15 0229
Downstream MH
15 0228
Dir. of Survey
Downstream
Length Surveyed
196.8 ft.
Total Length
196.8 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
195
O&M Index
2
O&M Quick
2G00
O&M Rating
78
Overall Index
2
Overall Quick
Overall Rating
273
Pipe schematic from manhole 15 0229 to 15 0228
MH: 15 0229MH: 15 0228downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02292 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start194.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish194.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish194.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish196.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0228

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWL
2SSS
2DAGS
194.6SAP
196.8AMH15 0228
2SAP
194.6SSS
0MWM
0AMH15 0229
194.6DAGS

Properties (7)

additional_info
630098052422202
custom_field_three
PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-05-25T03:04:52-07:00
documentation
PRO PIPE
is_lateral_inspection
false