Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 25, 2022, 10:32 AM
  • 15 0226_15 0225_05252022_044305.mp4

Date
05/25/2022
W/O
951848
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00627
PipeID
P12148
Time
3:32 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10127
Sewer Name
15 SAN JOSE CREEK TRUNK
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
02
Purpose
Routine Assessment
Project
WO_951848_TV15133_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
15 0226
Downstream MH
15 0225
Dir. of Survey
Downstream
Length Surveyed
232.3 ft.
Total Length
232.3 ft.
Structural Index
3
Structural Quick
5H3H
Structural Rating
460
O&M Index
2
O&M Quick
312G
O&M Rating
79
Overall Index
3
Overall Quick
Overall Rating
539
Pipe schematic from manhole 15 0226 to 15 0225
MH: 15 0226MH: 15 0225downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 0226, ABANDONED MH0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES39.9 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS80.4 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN210.3 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"230.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish230.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish230.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish230.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish232.3 ft. MGO - General Observation - ROACHES @ MH232.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0225

Observation photos (3)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    232.3 ft. - General Observation - ROACHES @ MH

Observations (17)

DistanceCodeObservation
0AMH15 0226, ABANDONED MH
0MWL
2SRV
2SSS
87.7TBOPEN
230.1SAP
232.3MGOROACHES @ MH
2SAP
210.3TBA
230.1DSZ
230.1SRV
0MWM
232.3AMH15 0225
80.4TBA
230.1SSS
39.9DSZDEBRIS
8ID

Properties (7)

additional_info
630098052422202
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-05-25T03:32:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false