Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 25, 2022, 10:45 AM
  • 15 0225_15 0224_05252022_045332.mp4

Date
05/25/2022
W/O
951848
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00627
PipeID
P12147
Time
3:45 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10127
Sewer Name
15 SAN JOSE CREEK TRUNK
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
WO_951848_TV15133_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
15 0225
Downstream MH
15 0224
Dir. of Survey
Downstream
Length Surveyed
168.9 ft.
Total Length
168.9 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
165
O&M Index
2
O&M Quick
2F00
O&M Rating
66
Overall Index
2
Overall Quick
Overall Rating
231
Pipe schematic from manhole 15 0225 to 15 0224
MH: 15 0225MH: 15 0224downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 02250 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. MGO - General Observation - 70% MAG COATING2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start16.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"56 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"166 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish166 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish166.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish168.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN168.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE168.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0224168.9 ft. MGO - General Observation - ROACHES @ MH

Observation photos (3)

  • General Observation - 70% MAG COATING

    2 ft. - General Observation - 70% MAG COATING

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    168.9 ft. - General Observation - ROACHES @ MH

Observations (17)

DistanceCodeObservation
166SSS
2MGO70% MAG COATING
168.9MGOCONN @ MH 3 O'CLOCK/UNKNOWN
2SAP
0AMH15 0225
166.1SAP
0MWM
168.9MGOCONN @ MH 9 O'CLOCK/ACTIVE
2SSS
2DAGS
166DAGS
56TFC
16.1TFC
0MWL
104.6TFC
168.9AMH15 0224
168.9MGOROACHES @ MH

Properties (7)

additional_info
630098052422202
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-05-25T03:45:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false