Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 27, 2022, 11:24 AM
  • B 0459_B 0458_06272022_053656.mp4

Date
06/27/2022
W/O
956733
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00093
PipeID
P08972
Time
4:24 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10209
Sewer Name
B JOINT OUTFALL B - UNIT 5C
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_956733_TV16079_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
57 in.
Upstream MH
B 0459
Downstream MH
B 0458
Dir. of Survey
Downstream
Length Surveyed
311.2 ft.
Total Length
311.2 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
180
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
3
Overall Quick
Overall Rating
302
Pipe schematic from manhole B 0459 to B 0458
MH: B 0459MH: B 0458downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 04590 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - 2 DROP CONNECTIONS @ MH - 3 O'CLK. (LOWER ONE IS ACTIVE.)0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start112.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"195.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"199.3 ft. MGO - General Observation - MAG COATING258.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"262 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"308.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish308.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish311.2 ft. AMH - Downstream Manhole, Survey Ends - B 0458311.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING

    199.3 ft. - General Observation - MAG COATING

  • General Observation - COCKROACHES IN MANHOLE

    311.2 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
0AMHB 0459
199.3MGOMAG COATING
0MWL
195.1TFC
262TFC
2DAGS
0MWM
308.6DAGS
258.5TFA
308.6SAP
112.9TBA
311.2AMHB 0458
0MGO2 DROP CONNECTIONS @ MH - 3 O'CLK. (LOWER ONE IS ACTIVE.)
7.2SAP
311.2MGOCOCKROACHES IN MANHOLE
0MGOCOCKROACHES IN MANHOLE

Properties (7)

additional_info
630098062722002
custom_field_three
AGGREGATE PROJECTING.
custom_field_two
3
customer
1
datetime
2022-06-27T04:24:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false