03 0309_03 0307_7272022_020121.mp4
2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - MAG COAT
2 ft. - General Observation - 100% MAG COAT
37.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
212.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE UNDER MAG COAT
212.9 ft. - General Photograph - PEELING MAG COAT
301.1 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - MAG COAT
340 ft. - General Observation - ZOOM DOWNSTREAM
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | NO FLOW |
| 212.9 | SSS | PEELING CONCRETE UNDER MAG COAT |
| 0 | MWM | — |
| 37.7 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| -5358.5 | MGO | NEW DVD H3162 |
| 340.5 | MSA | 20% MAG COAT DEBRIE STOPPED CAMERA |
| 0 | AMH | 2:05AM |
| 340 | DSZ | MAG COAT |
| 2 | DSZ | MAG COAT |
| 340 | MGO | ZOOM DOWNSTREAM |
| 2 | MGO | 100% MAG COAT |
| 212.9 | MGP | PEELING MAG COAT |
| 340 | SSS | BLISTERING PEELING CONCRETE |
| 301.1 | DSZ | MAG COAT |