Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 27, 2022, 04:53 AM
  • 18 0765_18 0764_05262022_231848.mp4

Date
05/26/2022
W/O
951855
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00706
PipeID
P14624
Time
9:53 PM
Certificate
U-0720-7030921
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10131
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_951855_TV18103_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0765
Downstream MH
18 0764
Dir. of Survey
Downstream
Length Surveyed
288.9 ft.
Total Length
288.9 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
278
O&M Index
3
O&M Quick
3G00
O&M Rating
117
Overall Index
3
Overall Quick
Overall Rating
395
Pipe schematic from manhole 18 0765 to 18 0764
MH: 18 0765MH: 18 0764downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - CONNECTION AT MH 3 AND 9 O'CLOCK0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07652 ft. MGO - General Observation - MAG COATING8.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start91.5 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS168.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"198.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"201.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"286.3 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish286.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish286.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish288.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK288.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE288.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0764

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • General Observation - MAG COATING

    2 ft. - General Observation - MAG COATING

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    288.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
2MGOMAG COATING
201.2TBA
198.7TBA
8.3SAV
0MGOCOCKROACHES IN MANHOLE
288.9MGOCONNECTION AT MH 9 O'CLOCK
0MGOCONNECTION AT MH 3 AND 9 O'CLOCK
13.8SSS
168.2TFA
0MWL
286.3DSZ
286.3SAV
0MWM
91.5DSZDEBRIS
288.9MGOCOCKROACHES IN MANHOLE
0AMH18 0765
288.9AMH18 0764
286.3SSS

Properties (7)

additional_info
630098052622202
custom_field_three
VISIBLE AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2022-05-26T21:53:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false