Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 27, 2022, 09:27 AM
  • 18 0731_18 0730_05272022_033311.mp4

Date
05/27/2022
W/O
951855
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00706
PipeID
P14584
Time
2:27 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10131
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_951855_TV18103_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0731
Downstream MH
18 0730
Dir. of Survey
Downstream
Length Surveyed
67 ft.
Total Length
67 ft.
Structural Index
4
Structural Quick
5A3A
Structural Rating
96
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
100
Pipe schematic from manhole 18 0731 to 18 0730
MH: 18 0731MH: 18 0730downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 07310 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start61.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish62.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish62.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish67 ft. MGO - General Observation - COCKROACHES IN MANHOLE67 ft. AMH - Downstream Manhole, Survey Ends - 18 0730

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    67 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
2DAGS
62.1DAGS
0AMH18 0731
0MGOCONNECTION AT MH 3 O'CLOCK
67MGOCOCKROACHES IN MANHOLE
0MWM
62.1SAP
0MWL
67AMH18 0730
2SRV
61.6SRV
2SAP
0MGOCOCKROACHES IN MANHOLE

Properties (7)

additional_info
630098052622202
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-05-27T02:27:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false