Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 25, 2022, 06:56 AM
  • H 0186_H 0185_05252022_020949.mp4

Date
05/24/2022
W/O
952114
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00168
PipeID
P10633
Time
11:56 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10126
Sewer Name
H JOINT OUTFALL H - UNIT 2B
City
BELL GARDENS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_952114_TV02360_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0186
Downstream MH
H 0185
Dir. of Survey
Downstream
Length Surveyed
599 ft.
Total Length
599 ft.
Structural Index
2
Structural Quick
3V2W
Structural Rating
583
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
587
Pipe schematic from manhole H 0186 to H 0185
MH: H 0186MH: H 0185downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 01862 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING23.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start596.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish596.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish599 ft. AMH - Downstream Manhole, Survey Ends - H 0185

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING

    2 ft. - General Observation - MAG COATING

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    23.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
596.4SSS
0MWM
2SSS
23.2SAP
0MWL
2MGOMAG COATING
596.4SAP
599AMHH 0185
0AMHH 0186

Properties (7)

additional_info
630098052422201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-05-24T23:56:31-07:00
documentation
PRO PIPE
is_lateral_inspection
false