Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 8, 2022, 10:31 AM
  • C 0192_C 0610_782022_034252.mp4

  • C 0192_C 0610_782022_043638.mp4

Date
07/08/2022
W/O
0957067
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00124
PipeID
P22822
Time
3:31 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3144
Sewer Name
C JOINT OUTFALL C - UNIT 3E
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
14
Purpose
Capital Improvement Program Assesment
Project
20220708MDM_JOINT_OUTFALL_C_UNIT_3E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
C 0192
Downstream MH
C 0610
Dir. of Survey
Downstream
Length Surveyed
80.8 ft.
Total Length
80.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
5241
O&M Rating
23
Overall Index
4
Overall Quick
Overall Rating
23
Pipe schematic from manhole C 0192 to C 0610
MH: C 0192MH: C 0610downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:35AM7.4 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - SLUDGE DEBRIE8 ft. MGO - General Observation - FR POLY LINER19.7 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE ROCKS DEBRIE38.7 ft. MWM - Water Mark, 100 %of cross sectional area48.1 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start80.2 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE ROCKS DEBRIE80.2 ft. DSZ - Deposits Settled Other, 80 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: NO - SLUDGE ROCKS DEBRIE80.2 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Finish80.8 ft. MSA - Survey Abandoned - 80% DEBRIE

Observation photos (5)

  • General Observation - FR POLY LINER

    8 ft. - General Observation - FR POLY LINER

  • Deposits Settled Other,  20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE ROCKS DEBRIE

    19.7 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE ROCKS DEBRIE

  • Water Mark, 100 %of cross sectional area

    38.7 ft. - Water Mark, 100 %of cross sectional area

  • Deposits Attached Grease, 20 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES, Start

    48.1 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start

  • Survey Abandoned - 80% DEBRIE

    80.8 ft. - Survey Abandoned - 80% DEBRIE

Observations (14)

DistanceCodeObservation
19.7DSZSLUDGE ROCKS DEBRIE
80.2DSZSLUDGE ROCKS DEBRIE
80.2DSZSLUDGE ROCKS DEBRIE
80.8MSA80% DEBRIE
38.7MWM
8MGOFR POLY LINER
0MGOConn. @ Mh, 3 O' Clock. Active
0MWM
0MGOConn. @ Mh, 9 O' Clock. Active
7.4DSZSLUDGE DEBRIE
48.1DAGS
0MWL
80.2DAGS
0AMH4:35AM

Properties (5)

customer
LACSD
datetime
2022-07-08T03:31:35-07:00
documentation
MARTIN,REVELES,CASTILLO
is_lateral_inspection
false
lining
FR POLY LINE