Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 8, 2022, 08:21 AM
  • C 0604_C 0219_782022_015100.mp4

Date
07/08/2022
W/O
0956948
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00124
PipeID
P09614
Time
1:21 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3144
Sewer Name
C JOINT OUTFALL C - UNIT 3E
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
14
Purpose
Capital Improvement Program Assesment
Project
20220708MDM_JOINT_OUTFALL_C_UNIT_3E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
C 0604
Downstream MH
C 0219
Dir. of Survey
Downstream
Length Surveyed
5.8 ft.
Total Length
5.8 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole C 0604 to C 0219
MH: C 0604MH: C 0219downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:35AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active1 ft. MGO - General Observation - PEELED LINER IN MH2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC5.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active5.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish - SEVERE AGG SPORATIC5.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE5.8 ft. AMH - Downstream Manhole, Survey Ends - 1:45AM

Observation photos (3)

  • General Observation - PEELED LINER IN MH

    1 ft. - General Observation - PEELED LINER IN MH

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start -  PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC

Observations (11)

DistanceCodeObservation
5.2MGOConn. @ Mh, 3 O' Clock. Active
5.2SAPSEVERE AGG SPORATIC
2SSSPEELING CONCRETE
5.8AMH1:45AM
0MWL
0AMH1:35AM
0MWM
5.2SSSPEELING CONCRETE
0MGOConn. @ Mh, 3 O' Clock. Active
1MGOPEELED LINER IN MH
2SAPSEVERE AGG SPORATIC

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2022-07-08T01:21:09-07:00
documentation
MARTIN,REVELES,CASTILLO
is_lateral_inspection
false