Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 3, 2022, 09:25 AM
  • 32 1195_32 1194_06032022_033901.mp4

Date
06/03/2022
W/O
951561
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P19649
Time
2:25 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10139
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_951561_TV32050_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
32 1195
Downstream MH
32 1194
Dir. of Survey
Downstream
Length Surveyed
429.7 ft.
Total Length
429.7 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
425
O&M Index
2
O&M Quick
432P
O&M Rating
182
Overall Index
2
Overall Quick
Overall Rating
607
Pipe schematic from manhole 32 1195 to 32 1194
MH: 32 1195MH: 32 1194downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 11952 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT4.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start111.9 ft. MWM - Water Mark, 70 %of cross sectional area111.9 ft. MWL - Water Level, 50 %of cross sectional area131.6 ft. MWL - Water Level, 25 %of cross sectional area131.6 ft. MWM - Water Mark, 50 %of cross sectional area427.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish427.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish427.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish429.7 ft. AMH - Downstream Manhole, Survey Ends - 32 1194

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
427.5SAP
111.9MWM
2SSS
0MWM
4.5SAP
0MWL
2DAGS
2MGOMAG COAT
429.7AMH32 1194
427.5DAGS
131.6MWL
427.5SSS
0AMH32 1195
131.6MWM
111.9MWL

Properties (8)

additional_info
630063060222203
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-06-03T02:25:04-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26872