Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 27, 2022, 10:15 AM
  • B 1282_B 1281_6272022_031747.mp4

Date
06/27/2022
W/O
0957304
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01126
PipeID
P25177
Time
3:15 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3135
Sewer Name
B JOINT OUTFALL B - UNIT 6J
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
12
Purpose
Capital Improvement Program Assesment
Project
20220627MDM_JOINT_OUTFALL_B_UNIT_6J
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
B 1282
Downstream MH
B 1281
Dir. of Survey
Downstream
Length Surveyed
270.9 ft.
Total Length
270.9 ft.
Structural Index
2
Structural Quick
4124
Structural Rating
12
O&M Index
3
O&M Quick
4237
O&M Rating
33
Overall Index
3
Overall Quick
Overall Rating
45
Pipe schematic from manhole B 1282 to B 1281
MH: B 1282MH: B 1281downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:15AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE SEVERE AGG ATTACHED2.3 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 4%4.9 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 4%13.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELUING CONCRETE SEVERE AGG ATTACHED21.6 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR34.6 ft. MMC - Material Change, Vitrified clay pipe54.5 ft. MMC - Material Change, Concrete pipe (non-reinfored)59.3 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 3%60.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED83.4 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 3%107.4 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Start123.5 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Finish163.4 ft. RMB - Roots Medium Barrell, from 08 to 04 o'clock, 5 %, within 8 inches of joint: NO169.8 ft. RMJ - Roots Medium Joint, from 08 to 10 o'clock, 5 %, within 8 inches of joint: YESR197.4 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR203.3 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR215.7 ft. RMB - Roots Medium Barrell, from 12 to 04 o'clock, 5 %, within 8 inches of joint: YES230.7 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Start240.7 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Finish240.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED257.9 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 15 %, within 8 inches of joint: YESR270.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE SEVERE AGG ATTACHED270.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG270.9 ft. AMH - Downstream Manhole, Survey Ends - 3:40AM

Observation photos (13)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    0 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE SEVERE AGG ATTACHED

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELUING CONCRETE SEVERE AGG ATTACHED

    13.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELUING CONCRETE SEVERE AGG ATTACHED

  • Material Change, Vitrified clay pipe

    34.6 ft. - Material Change, Vitrified clay pipe

  • Material Change, Concrete pipe (non-reinfored)

    54.5 ft. - Material Change, Concrete pipe (non-reinfored)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED

    60.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED

  • Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Start

    107.4 ft. - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Start

  • Roots Medium Barrell, from 08 to 04 o'clock, 5 %, within 8 inches of joint: NO

    163.4 ft. - Roots Medium Barrell, from 08 to 04 o'clock, 5 %, within 8 inches of joint: NO

  • Roots Medium Joint, from 08 to 10 o'clock, 5 %, within 8 inches of joint: YESR

    169.8 ft. - Roots Medium Joint, from 08 to 10 o'clock, 5 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR

    197.4 ft. - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Start

    230.7 ft. - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED

    240.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED

  • Roots Medium Joint, from 08 to 04 o'clock, 15 %, within 8 inches of joint: YESR

    257.9 ft. - Roots Medium Joint, from 08 to 04 o'clock, 15 %, within 8 inches of joint: YESR

Observations (29)

DistanceCodeObservation
0MWL
0AMH3:15AM
21.6RMJ
215.7RMB
107.4RMJ
163.4RMB
2.3RFJ4%
230.7RMJ
59.3RFJ3%
270.4SSSBLISTERING PEELING CONCRETE SEVERE AGG ATTACHED
60.1SSSPEELING CONCRETE SEVERE AGG ATTACHED
270.4SAMSEVERE AGG
34.6MMC
4.9RFJ4%
169.8RMJ
240.7RMJ
203.3RMJ
240.8SSSPEELING CONCRETE SEVERE AGG ATTACHED
270.9AMH3:40AM
0MGOConn. @ Mh, 3 O' Clock. Active
83.4RFJ3%
2SSSBLISTERING PEELING CONCRETE SEVERE AGG ATTACHED
0SAMSEVERE AGG
13.9SSSBLISTERING PEELUING CONCRETE SEVERE AGG ATTACHED
197.4RMJ
0MWM
54.5MMC
123.5RMJ
257.9RMJ

Properties (6)

custom_field_three
BLISTERING PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2022-06-27T03:15:12-07:00
documentation
MARTIN,REVELES,OLIVERV111,IGNACIO
is_lateral_inspection
false