Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 9, 2022, 09:23 AM
  • 02 0034_02 0033_692022_024234.mp4

Date
06/09/2022
W/O
0957066
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00234
PipeID
P03066
Time
2:23 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3113
Sewer Name
02 ARTESIA EXTENSION TRUNK
City
BELLFLOWER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Capital Improvement Program Assesment
Project
20220609MDM_ARTESIA_EXTENSION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 0034
Downstream MH
02 0033
Dir. of Survey
Downstream
Length Surveyed
331.9 ft.
Total Length
331.9 ft.
Structural Index
3
Structural Quick
4432
Structural Rating
32
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
36
Pipe schematic from manhole 02 0034 to 02 0033
MH: 02 0034MH: 02 0033downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:40AM0 ft. MWM - Water Mark, 50 %of cross sectional area3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SLIGHT5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SL10.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT11.1 ft. SSS - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE35.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped38.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped63.1 ft. SSS - Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: YES - PELING OUTER SURFACE78.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - UNUSAL SPALLING133.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped136 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped191.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SLIGHT203.5 ft. MGP - General Photograph - VCP SPALLING203.5 ft. SSS - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - FLAKING OUTER LAYER234.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped237 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped295.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SLIGHT310.2 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES - H310.2 ft. FC - Fracture Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES - SL325.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped327.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - SL331.4 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish - SL331.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - UNUSAL SPALLING331.9 ft. AMH - Downstream Manhole, Survey Ends - 3:40AM

Observation photos (11)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SLIGHT

    3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SLIGHT

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SL

    5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SL

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT

    10.5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT

  • Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE

    11.1 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE

  • Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: YES - PELING OUTER SURFACE

    63.1 ft. - Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: YES - PELING OUTER SURFACE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - UNUSAL SPALLING

    78.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - UNUSAL SPALLING

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SLIGHT

    191.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SLIGHT

  • General Photograph - VCP SPALLING

    203.5 ft. - General Photograph - VCP SPALLING

  • Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - FLAKING OUTER LAYER

    203.5 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - FLAKING OUTER LAYER

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - SL

    327.3 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - SL

  • Downstream Manhole, Survey Ends - 3:40AM

    331.9 ft. - Downstream Manhole, Survey Ends - 3:40AM

Observations (26)

DistanceCodeObservation
0MWL
35.3TFCCapped
5FMSL
63.1SSSPELING OUTER SURFACE
331.9AMH3:40AM
136TFCCapped
325.8TFCCapped
331.4FLSL
191.1FMSLIGHT
237TFCCapped
11.1SSSPEELING OUTER SURFACE
203.5MGPVCP SPALLING
10.5FMSLIGHT
133.3TFCCapped
203.5SSSFLAKING OUTER LAYER
3FMSLIGHT
234.3TFCCapped
0AMH2:40AM
331.4SSSUNUSAL SPALLING
295.1FMSLIGHT
310.2FLH
78.3SSSUNUSAL SPALLING
327.3FLSL
0MWM
38.2TFCCapped
310.2FCSL

Properties (6)

custom_field_three
MULTIPLE SLIGHT FRACTURES-UNUSAL SPALLING
custom_field_two
2
customer
LACSD
datetime
2022-06-09T02:23:45-07:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO