02 0034_02 0033_692022_024234.mp4
3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SLIGHT
5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SL
10.5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT
11.1 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE
63.1 ft. - Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: YES - PELING OUTER SURFACE
78.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - UNUSAL SPALLING
191.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES - SLIGHT
203.5 ft. - General Photograph - VCP SPALLING
203.5 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - FLAKING OUTER LAYER
327.3 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - SL
331.9 ft. - Downstream Manhole, Survey Ends - 3:40AM
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 35.3 | TFC | Capped |
| 5 | FM | SL |
| 63.1 | SSS | PELING OUTER SURFACE |
| 331.9 | AMH | 3:40AM |
| 136 | TFC | Capped |
| 325.8 | TFC | Capped |
| 331.4 | FL | SL |
| 191.1 | FM | SLIGHT |
| 237 | TFC | Capped |
| 11.1 | SSS | PEELING OUTER SURFACE |
| 203.5 | MGP | VCP SPALLING |
| 10.5 | FM | SLIGHT |
| 133.3 | TFC | Capped |
| 203.5 | SSS | FLAKING OUTER LAYER |
| 3 | FM | SLIGHT |
| 234.3 | TFC | Capped |
| 0 | AMH | 2:40AM |
| 331.4 | SSS | UNUSAL SPALLING |
| 295.1 | FM | SLIGHT |
| 310.2 | FL | H |
| 78.3 | SSS | UNUSAL SPALLING |
| 327.3 | FL | SL |
| 0 | MWM | — |
| 38.2 | TFC | Capped |
| 310.2 | FC | SL |