Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 15, 2022, 11:23 AM
  • 01 0375_01 0374_6152022_042728.mp4

Date
06/15/2022
W/O
0917421
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00208
PipeID
P00849
Time
4:23 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3119
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Capital Improvement Program Assesment
Project
20220608MDM_HOLMES_WILLOWBROOK_TRUNK
Material
RCP-CTL
Shape
Circular
Height
30 in.
Upstream MH
01 0375
Downstream MH
01 0374
Dir. of Survey
Downstream
Length Surveyed
389.9 ft.
Total Length
389.9 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
4
O&M Quick
5142
O&M Rating
18
Overall Index
3
Overall Quick
Overall Rating
24
Pipe schematic from manhole 01 0375 to 01 0374
MH: 01 0375MH: 01 0374downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:50AM0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN0 ft. MWM - Water Mark, 60 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CHIPPING OUTER SURFACE2 ft. MGO - General Observation - TILES 100% IN PLACE10.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish10.8 ft. DAGS - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start16.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE TILES57.5 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE UNDER FLOW102.3 ft. MGO - General Observation - TILES 100% IN PLACE141.6 ft. DSZ - Deposits Settled Other, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start - SLUDGE141.6 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE189 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active198.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE TILES389.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish389.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active389.2 ft. DSZ - Deposits Settled Other, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE389.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active389.2 ft. DAGS - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish389.9 ft. AMH - Downstream Manhole, Survey Ends - 5:40AM

Observation photos (8)

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING  CHIPPING OUTER SURFACE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CHIPPING OUTER SURFACE

  • General Observation - TILES 100% IN PLACE

    2 ft. - General Observation - TILES 100% IN PLACE

  • Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    10.8 ft. - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE TILES

    16.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE TILES

  • General Observation - TILES 100% IN PLACE

    102.3 ft. - General Observation - TILES 100% IN PLACE

  • Deposits Settled Other,  40 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE

    141.6 ft. - Deposits Settled Other, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start - SLUDGE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE TILES

    198.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE TILES

Observations (23)

DistanceCodeObservation
189TFAActive
57.5DSZSLUDGE UNDER FLOW
10.8DAGS
0AMH4:50AM
10.8DAGS
141.6DSZSLUDGE
16.8SSSPEELING OUTER SURFACE TILES
2DAGS
141.6DSZSLUDGE
389.2SSS
198.1SSSPEELING OUTER SURFACE TILES
2SSSPEELING CHIPPING OUTER SURFACE
0MGOConn. @ Mh, 9 O' Clock. OPEN
0MWL
2MGOTILES 100% IN PLACE
389.2MGOConn. @ Mh, 3 O' Clock. Active
389.2DSZSLUDGE
389.2MGOConn. @ Mh, 9 O' Clock. Active
389.9AMH5:40AM
102.3MGOTILES 100% IN PLACE
0MGOConn. @ Mh, 3 O' Clock. OPEN
389.2DAGS
0MWM

Properties (6)

custom_field_three
SPALLING PEELING CHIPPING OUTER SURFACE TILES
custom_field_two
3
customer
LACSD
datetime
2022-06-15T04:23:49-07:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false