Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2022, 10:07 AM
  • 01 0374_01 0373_6142022_032220.mp4

Date
06/14/2022
W/O
0917421
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00208
PipeID
P00848
Time
3:07 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3118
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Capital Improvement Program Assesment
Project
20220608MDM_HOLMES_WILLOWBROOK_TRUNK
Material
RCP-CTL
Shape
Circular
Height
30 in.
Upstream MH
01 0374
Downstream MH
01 0373
Dir. of Survey
Downstream
Length Surveyed
459.9 ft.
Total Length
459.9 ft.
Structural Index
2
Structural Quick
2400
Structural Rating
8
O&M Index
3
O&M Quick
4133
O&M Rating
13
Overall Index
3
Overall Quick
Overall Rating
21
Pipe schematic from manhole 01 0374 to 01 0373
MH: 01 0374MH: 01 0373downstream0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 3:45AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - CHIPPING PEELING OUTER SURFACE2 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - TILES 100% IN PLACE12.4 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: NO18.2 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO50.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CHIPPING OUTER SURFACE69.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6", 6" - Active79.9 ft. DSZ - Deposits Settled Other, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Start - GREASE SLUDGE106.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE139.1 ft. MGO - General Observation - MISSING TILE176 ft. MGO - General Observation - PALLING TILES 100% IN PLACE225 ft. MGO - General Observation - MISSING TILE268 ft. MGO - General Observation - MISSING TILE301.2 ft. MGO - General Observation - 100% TILES IN PLACE301.2 ft. MGO - General Observation - MISSING TILE354.3 ft. DSZ - Deposits Settled Other, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Finish - SLUDGE GREASE396 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CHIPPING OUTER SURFACE459.3 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish459.3 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active459.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CHIPPING OUTER SURFACE459.9 ft. AMH - Downstream Manhole, Survey Ends - 5:00AM

Observation photos (16)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - CHIPPING PEELING OUTER SURFACE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - CHIPPING PEELING OUTER SURFACE

  • Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - TILES 100% IN PLACE

    2 ft. - General Observation - TILES 100% IN PLACE

  • Deposits Attached Grease, 20 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: NO

    12.4 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: NO

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO

    18.2 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CHIPPING OUTER SURFACE

    50.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CHIPPING OUTER SURFACE

  • Deposits Settled Other,  30 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO, Start - GREASE SLUDGE

    79.9 ft. - Deposits Settled Other, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Start - GREASE SLUDGE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE

    106.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OUTER SURFACE

  • General Observation -  MISSING TILE

    139.1 ft. - General Observation - MISSING TILE

  • General Observation - PALLING TILES 100% IN PLACE

    176 ft. - General Observation - PALLING TILES 100% IN PLACE

  • General Observation - MISSING  TILE

    225 ft. - General Observation - MISSING TILE

  • General Observation - MISSING  TILE

    268 ft. - General Observation - MISSING TILE

  • General Observation - 100% TILES IN PLACE

    301.2 ft. - General Observation - 100% TILES IN PLACE

  • General Observation - MISSING TILE

    301.2 ft. - General Observation - MISSING TILE

  • Deposits Settled Other,  30 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO, Finish - SLUDGE GREASE

    354.3 ft. - Deposits Settled Other, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Finish - SLUDGE GREASE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CHIPPING OUTER SURFACE

    396 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CHIPPING OUTER SURFACE

Observations (26)

DistanceCodeObservation
459.3DAGS
0MGOConn. @ Mh, 9 O' Clock. Active
301.2MGO100% TILES IN PLACE
2SSSCHIPPING PEELING OUTER SURFACE
176MGOPALLING TILES 100% IN PLACE
0MWM
459.3MGOConn. @ Mh, 3 O' Clock. Active
225MGOMISSING TILE
301.2MGOMISSING TILE
354.3DSZSLUDGE GREASE
396SSSPEELING CHIPPING OUTER SURFACE
79.9DSZGREASE SLUDGE
2DAGS
18.2DAGS
268MGOMISSING TILE
106.5SSSPEELING OUTER SURFACE
139.1MGOMISSING TILE
12.4DAGS
459.3SSSPEELING CHIPPING OUTER SURFACE
0MGOConn. @ Mh, 3 O' Clock. Active
69.8TFAActive
459.9AMH5:00AM
2MGOTILES 100% IN PLACE
0AMH3:45AM
0MWL
50.6SSSPEELING CHIPPING OUTER SURFACE

Properties (6)

custom_field_three
SPAALING OUTER SURFACE TILES-99%IN PLACE
custom_field_two
3
customer
LACSD
datetime
2022-06-14T03:07:32-07:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false