Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 30, 2022, 10:51 AM
  • J 0224_J 0223_6302022_040840.mp4

Date
06/30/2022
W/O
0941443
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P11470
Time
3:51 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3139
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALO VERDES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47
Purpose
Capital Improvement Program Assesment
Project
20220628MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0224
Downstream MH
J 0223
Dir. of Survey
Downstream
Length Surveyed
354.8 ft.
Total Length
354.8 ft.
Structural Index
3
Structural Quick
5134
Structural Rating
23
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
28
Pipe schematic from manhole J 0224 to J 0223
MH: J 0224MH: J 0223downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:15AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG13.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC42.5 ft. SAP - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG64.6 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR128.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK159.2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - ROCK241 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE263.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, - SEVERE AGG332.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE354.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE354.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped354.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG354.8 ft. AMH - Downstream Manhole, Survey Ends - 4:45AM

Observation photos (10)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC

    13.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC

  • Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

    42.5 ft. - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

    64.6 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - ROCK

    128.4 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK

  • Deposits Settled Other,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES - ROCK

    159.2 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - ROCK

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    241 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES,  - SEVERE AGG

    263.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    332.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

Observations (17)

DistanceCodeObservation
263.4SAPSEVERE AGG
354.2SSSBLISTERING PEELING CONCRETE
241SSSBLISTERING PEELING CONCRETE
64.6SRVCIRCUM REBAR
0MWL
2SSSBLISTERING PEELING CONCRETE
159.2DSZROCK
354.8AMH4:45AM
2SAVSEVERE AGG
128.4DSZROCK
354.7SAVSEVERE AGG
13.1SAVSEVERE AGG VERY SPORATIC
332.7SSSPEELING CONCRETE
354.2MGOConn. @ Mh, 9 O' Clock. Capped
0AMH4:15AM
0MWM
42.5SAPSEVERE AGG

Properties (6)

custom_field_three
CIRCUM REBAR VISIBLE
custom_field_two
2
customer
LACSD
datetime
2022-06-30T03:51:02-07:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false